Services · Event, Campaign & Promotion
Displays, merchandise and campaign sets need a coordinated route to their destination. PROWERB connects preparation, distribution, dates and agreed returns.

Agree locations, quantities and the campaign date.
Get products, displays and inserts ready and complete.
Bring shipping, returns and the digital campaign together.
A POS campaign has a deadline: the week the display must be standing in the store. Before it lies peak load — storing, fitting, kitting and delivering displays. After it: nothing, until the next campaign. A warehouse optimized for steady throughput cannot absorb such peaks without jeopardizing the rest of operations.
PROWERB therefore separates the two: permanently listed items run through fulfillment, campaigns through the campaign line — the MOTION pillar of the operating model. During peaks, capacity grows to 200 percent of baseline capacity within 24 hours and to 400 percent of baseline capacity within 72 hours, via a flex-staff pool and shift expansion.
Promotion Engine · Our software and fulfilment
The Promotion Engine connects the digital campaign with practical fulfilment. We align participation, checks, rewards, shipping and enquiries with your campaign mechanics.
Every campaign follows the same documented process. It starts with data, not with goods — so the line is set up before the first pallet arrives.
Import of the shipment list and delivery advice via the online tool or the MEP platform. Recipients, quantities and dates are in the system before delivery arrives.
Campaign goods and displays arrive just in time. Flat-delivered displays run through the fishbone inflow: unfold, slot, inspect, label, palletize.
Staff scheduling and changeover in under three hours. Process engineering verifies the setup, the production readiness check clears the line.
Display fitting, co-packing, kitting & assembly — depending on the campaign mechanics, from small batches to 15,000 kits a day.
Final inspection and labelling. Every unit is checked before it goes to staging.
Ready 2 Go: to retail central warehouses, directly to stores, to gastronomy or to the end customer — B2B, B2C and D2C.
Peak scaling · campaign line
Floater pool · extended shifts · changeover under 3 hours
1 to 15,000 shipments per day on the same line
The curve shows where the campaign line adds capacity. The prepared resources behind the rise are what make it work.
Campaign logistics at PROWERB is not a special shift within fulfillment, but its own operating unit with its own line, its own process, and its own account-management layer: Account Management Promotions.
The approved dispatch list connects store, quantity and placement date. Material, completion and dispatch updates return to campaign owners. Robotics and cobots are used where appropriate for the product and operation; packing effort, available goods, approved data and staffing determine the actual ramp-up.
The densest cadence of POS campaigns is in the beverage sector — that's also where PROWERB's industry depth is greatest. These peak figures refer to baseline output: 200% is double, 400% is fourfold (+300%). Achievable volume and lead time are agreed for the item mix, goods and data availability, staffing and shift plan.
POS campaigns tie into campaigns, events and the ongoing assortment. The adjacent services:
The complete campaign stretch: goods receipt and display preparation, display fitting, co-packing and kitting & assembly, handling of special goods such as glass and bulky items, and distribution to retail, gastronomy and end customers.
Both are possible. Flat-delivered displays run through the fishbone inflow: unfold, slot, inspect, label, palletize — then they go onto the line fitted and ready to ship.
1 to 15,000 shipments per day, from small campaigns to major ones. During peaks, capacity grows to 200 percent of baseline capacity within 24 hours and to 400 percent of baseline capacity within 72 hours — via a flex-staff pool and shift expansion.
Yes. Depending on the campaign mechanics, goods go to grocery-retail central warehouses, directly to individual stores, to gastronomy, or by parcel to end customers — from the small bonus item to full-truckload size.
Via the online tool, the campaign module of the MEP platform, as an order file via SFTP, or via interface. The path depends on your system landscape.
In the Operations Cockpit: Power BI live reports, track-and-trace, inventory trends and automated extracts — available around the clock and integrable into customer systems.
Are timing, goods or execution starting to fail? Send the bottleneck and critical deadline straight into operational review.
In the briefing we clarify campaign mechanics, volume, display type and delivery routes — and set when the line will be ready.